ENERGIRON
  • ABOUT US
    • PIONEERING ACHIEVEMENTS
    • OUR COMMITMENT
  • INPUT MATERIALS
    • IRON ORE
    • REFORMED GAS | SYNGAS | COG
    • CONSUMPTIONS
  • TECHNOLOGY
    • ENERGIRON ZR
    • ENERGIRON III
    • HYTEMP SYSTEM
  • ENVIRONMENT
    • CO2 REMOVAL SYSTEM
    • HYDROGEN
  • PLANTS
    • ENERGIRON PLANTS
    • MICRO – MODULE
    • MINI – MODULE
    • CUSTOM – MODULE
  • VIRTUAL TOUR
  • PRODUCTS
    • HOT DRI
    • COLD DRI
    • HIGH CARBON DRI
    • HBI
    • HIGH CARBON HBI
  • COMPETENCES
    • GOODS
    • SERVICES
  • NEWS&MEDIA
    • NEWS
    • BROCHURES
    • PAPERS AND PUBLICATIONS
    • VIDEO
  • CONTACT US
PREMIUM QUALITY DRI PRODUCTS FROM ENERGIRON
23 July, 2019
Interview with the Vice-President of Danieli Centro Metallics
25 March, 2020
Published by energiron on 2 January, 2020
Categories
  • Press
Tags
Jan 01, 2020

​ENERGIRON DRI plant #1 10th anniversary

The ENERGIRON team is celebrating the 10th year of operation of the Direct Reduction Plant - Phase 1 at Abu Dhabi (UAE) and congratulates with Emirates Steel for setting new production and availability records during last years.
Emirates Steel operates two twin plants based on the ENERGIRON III technology, originally conceived to produce 1,6 Mtpy of hot and cold DRI at 94% of metallization and 2.5% Carbon. Thanks to the Hytemp® System, the high-quality Hot DRI is directly charged into the Danieli EAF, allowing the excellent electrical consumption of just 380 kWh/tLS, which is a worldwide benchmark for all modern DRI-based minimills.
Both plants were later revamped at 2 Mtpy of DRI in 2014, with minor modifications carried out in just 1-month time during the annual shutdown; the production was then stabilized at 100% of the enhanced nominal capacity in just 6 months.
Nowadays, thanks to the efficiency, competitiveness, and pursuit of excellence that always characterized the Emirates Steel team, the ENERGIRON DR plants in Abu Dhabi are consistently operating within standard operational availability, producing excellent quality DRI and liquid steel at the lowest OPEX for any DRI-based minimill.
Share
0
energiron
energiron

Related posts

10 October, 2022

2022 Energiron® Licensee Conference – Two-day event hosted by Tenova and Danieli


Read more
13 September, 2022

TATA STEEL CHOOSES ENERGIRON® TECHNOLOGY


Read more
1 April, 2022

Energiron ® Largest Hydrogen-Based DRI Facility in China for Baosteel Zhanjiang


Read more

Comments are closed.

DANIELI HEADQUARTERS
Via Nazionale 41, 33042 Buttrio (UD) Italy
Tel (39) 0432.1958111 | Fax (39) 0432.1958289
info.dcmt@danieli.com

TENOVA HEADQUARTERS
Via Gerenzano 58, 21053 Castellanza (VA), Italy
Tel (39) 0331 444111 | Fax (39) 0331 444390
tenova@tenova.com

  • Cookie Policy
  • Plants Reference List
  • Privacy
© 2023 ENERGIRON. All Rights Reserved. Muffin group